Clay's buddy Adam and his wife Kelly and their little girl Shelby came down for the weekend. Whenever Adam comes down, it's time to get a project done. Last time he came we did electrical work around the house, the time before that it was telephone line work. This time was no different. We redid the base of the shower. The last pour for some reason didn't sent up well and came out all wavy and lumpy. So we ripped it up and there it sat for months. Then Adam calls and time to get to work. This pour set up great.
A few weeks later after we were sure it was all nice and set, we (I should say Clay) tiled the floor. He did an amazing job! In between these two pours Clay textured the walls. After we laid the tile Clay put on a coat of paint, waited a few weeks and added another another coat of paint. Now all we have left to do is tile the walls and the floor and add in the necessities. He also put up the light fixture after the paint dried. We now have light in the bathroom! It's coming along, more updates to come!Saturday, March 24, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment